UGC 12(B) Status and Accredited with 'A' Grade(CGPA 3.17) by NAAC (1st Cycle)

Open Dug Well

Open Dug Well

A small open dug well was established to collect the rainwater and used for uninterrupted water supply.

Open Dug Well